In recent years, NCOC experienced failures in its three instrument-air compressors. The issue was associated with the existing protection system based on a stand-alone ABB controller. Those controls were installed without the necessary tests and therefore relied on theoretical surge curves and operation.
As a temporary solution, the compressors were operated with vent valves partially open, limiting their maximum capacity.
Eventually, during 2020, a solution was defined: implement surge protection and detection in the current PLCs and disable the legacy protection system.
Throughout the project, the following tasks were carried out:
NCOC North Caspian Operating Company
LocationNCOC Karabatan Plant (Iskene West), Kazakhstan
Period2023